Work on Elbury Hill 2 is now complete, the route we've used to access the site with our machinery has been put back with top soil and grass seeded and a path has been installed down to the edge of the reservoir using concrete.
The ducting which is currently visible in the gravel will need to be altered so that it runs under the gravel and there is a meeting planned on site in the near future regarding the best way to acheive this.
We are now completely finished here at Elbury and have left the site, we've made sure all areas have been swept and left clean and tidy.
I would like to take this opportunity to thank all the local residents of Ebury Park Road for there continued understanding and patience whilst these works have been going on.
Thank you all.